Restoration Work Begins
View of the driver's side showing the new body panels welded to the tub. Note Chief Gluhm, US Navy pipe fitter on temporary assignment.
View of the new body panels and fuel tank well from the inside.
View of both sides of engine before removing from frame.
Tub removed. Drive train is next.
Contemplation over another challenge in the restoration process.
Installing the new "hat channel" floor supports.
The major components of the jeep.
NEXT STEP: Body work on the jeep. Click here to see the body work.